Kier Construction had a requirement for a large building wrap with a difference; they needed to completely weatherproof the open front of a large steel frame building for a three month period so they could continue with interior works and keep the project on schedule, while waiting for specialist external cladding to be manufactured on a long lead time. At the same time, they wanted to prominently display the brands of the key project stakeholders.
Graphic Arts designed, produced and installed a super-wide format banner to cover the complete frontage of the building including installing a tensioning system. At a finished overall size 16m wide x 23m wide high this was no mean feat and the successful installation, in turn, enabled the client to keep the main construction project on track.
Kier Construction
Kier Construction had a requirement for a large building wrap with a difference; they needed to completely weatherproof the open front of a large steel frame building for a three month period so they could continue with interior works and keep the project on schedule, while waiting for specialist external cladding to be manufactured on a long lead time. At the same time, they wanted to prominently display the brands of the key project stakeholders.
Graphic Arts designed, produced and installed a super-wide format banner to cover the complete frontage of the building including installing a tensioning system. At a finished overall size 16m wide x 23m wide high this was no mean feat and the successful installation, in turn, enabled the client to keep the main construction project on track.